Establishment of New ITI

Establishment of New ITI 

  • Prepare Detailed Project Plan
  • Market analysis and feasibility report
  • Cost estimation and budget allocation report
  • Site analysis report with demographic factors
  • Infrastructure and facilities requirements
  • Statutory regulations and Affiliation requisites
  • Operating expenses and Revenue report. 
 
  • Consulting NGO Formation and Grant
  • Society registration with comprehensive byelaws
  • Trust formation- Charitable Trust registration
  • Architecture Support; Design and Monitoring
  • Develop Master Plan for Institute Building
  • The approach towards Cost and Time-saving Design
  • Detailed engineering design for construction
  • Building Layout comply with DGT/NCVT Norms
  • The building structure as per National Building Code
  • Close Supervision and direction at ITI Site, and Also
 
  • Online Application Submission and Follow-up
  • Create separate Email Account for Application Use
  • Submit online application and generate Application No.
  • Clear Desktop Assessment Query within 2 days, if any.
  • Coordinate with State Directorate to obtain State NOC
  • Update application for Civil work and Machine Setup
  • Date selection and Inspection compliance as per Norms, Know more
 
  • Human Resource Planning and Training
  • Calculate total posts of Technical and non-technical staff
  • Advertisement in local media and arrange Interview process
  • Staff selection as per qualification and competency criteria
  • Deployment of staff as per latest NCVT affiliation Norms
  • Furnish Time Table, duties, rules and regulations for staff
  • Develop required tools for ‘Teaching- Learning Process’
 
  • Workshop Installation as per DGT norms
  • Safe installation procedures of equipment/Machinery
  • Tools/ Equipment layout as per latest DGT guideline
  • Grouting and Engraving/Hard punch on Heavy machines
  • Wiring procedure comply with the standard code of Electrical
  • Provide wall chart for safety and Machine operating steps
  • Availability of machine operator on the day of inspection 
 
  • Onsite Pre-Assessment Audit
  • Awareness training to management about inspection
  • Assess adequacy and completeness of the documents
  • Assess finishing of Civil Work as per NCVT Criteria
  • Ensure availability of Tools/Machinery as per Norms
  • The testing working condition of all installed Machinery
  • Assess readiness with respect to latest NCVT norms, And more
 
  • NCVT Affiliation of the New ITI
  • Appoint Technical and supporting staff after Accreditation
  • Upload all required supporting Documents in Application
  • Develop Website of ITI and upload all relevant data on it
  • Submission of clarification raised by any authority, if any
  • Coordinate with NCVT/DGT and Follow up Procedures
  • Application comply with affiliation norms, Get Affiliated, Know more
  • Documentation and Statutory Approvals
  • Design building map with site plan and get approval
  • Prepare all required Resolutions, Affidavits/Formats
  • Furnish Building Completion Certificate (BCC)
  • Fire safety certificate and Disaster Management Plan
  • Documents compliance with latest NCVT Affiliation
  • Furnish 3 Hard copies and a soft copy of the record, And also
 
  • Develop Quality Manual System (QMS)
  • Define vision, Goals and Quality Policy of Institute
  • Organization structure and Governance framework
  • Admission policy and student development interface
  • Training standardization system and support processes
  • Performance measurement and improvement processes
  • Apprenticeship Scheme and Placement Mechanisms, Know more
 
  • Consulting Tools/Machinery Purchase
  • Have approved More than 20+ supplier all over India
  • BIS/ISO certified Equipment and Machinery of Trades
  • Furnish Tender requisite and liaison with Tools supplier
  • Expert testing of working conditions before site delivery
  • Ensure adequacy of items as per NCVT/DGT trades syllabus
  • Play significant roles during warranty periods of Machinery
 
  • Onsite Pre-Assessment Audit
  • Awareness training to management about inspection
  • Assess adequacy and completeness of the documents
  • Assess finishing of Civil Work as per NCVT Criteria
  • Ensure availability of Tools/Machinery as per Norms
  • The testing working condition of all installed Machinery
  • Assess readiness with respect to latest NCVT norms, And more
 
  • Accreditation of New ITI
  • Assess requirement of ITI and Trades at the given location
  • Furnish file documents and obtain local authority approvals
  • Online file submission and generate Application Number
  • Obtain State NOC and further file updating for next Stages
  • Clear Desktop assessment Query, preparation for Inspection
  • Coordinate with Inspection team and close objections/NCs, Read More
 

GET START A COMPLETE SOLUTIONS FOR ITI

May I Help You?

You Can directly Contact us on 9406369160 / 94060888508